Sample Opportunity Brief · Texas

Sample brief: 200 MW solar in Texas

A real Opportunity Brief from Voltane's engine on its Texas data, frozen: the first page as a buyer receives it. The full brief continues with the site comparison, risks, evidence and method.

Objective

A 200 MW solar + storage project in Texas: a site of at least 1,000 acres, a 345 kV line within 2 miles, no more than 500 MW of queued projects within 10 miles, and no federal land. Interconnection capacity at the point of interconnection is also a must-have.

Region
Texas
Project type
Solar
Unit
Parcel sites
Target size
200 MW, indicative
Screened
117,681 sites

Unresolved must-haves

Outcome

No site is counted as meeting the requirements while a must-have is unresolved.

Shortlist

Match to default solar + storage profile. Ranked by match within "Needs more information". A match is not a Voltane score, and it never outranks a must-have.

  1. 148479-00667Webb County, Texas98% match

    Grid: ERCOT

    5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information

    • Pass Site size: 2,110 ac meets the 1,000 ac minimum
    • Pass EHV line (345 / 380 kV+): 1.2 mi is within the 2 mi maximum
    • Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
    • Pass Federal land: no (required: no)
    • Pass Indicative size: 419 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
    • Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
  2. 248479-00668Webb County, Texas98% match

    Grid: ERCOT

    5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information

    • Pass Site size: 3,896 ac meets the 1,000 ac minimum
    • Pass EHV line (345 / 380 kV+): 0.1 mi is within the 2 mi maximum
    • Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
    • Pass Federal land: no (required: no)
    • Pass Indicative size: 825 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
    • Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
  3. 348479-00706Webb County, Texas98% match

    Grid: ERCOT

    5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information

    • Pass Site size: 2,647 ac meets the 1,000 ac minimum
    • Pass EHV line (345 / 380 kV+): 0.5 mi is within the 2 mi maximum
    • Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
    • Pass Federal land: no (required: no)
    • Pass Indicative size: 518 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
    • Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)

Next checks

  1. Pull the official county record for each shortlisted site (the property ID and record link are in its site panel) and confirm ownership, boundaries and current use.
  2. Ask the utility or grid operator for a pre-application or feasibility review: distance to a line or substation is not interconnection, and queue figures are a competition proxy only.
  3. Check county and municipal rules for the technology (local restrictions are listed in each site panel where known).
  4. Voltane takes no action with outside parties: any contact with landowners, utilities or agencies is yours to make.

Requirements as screened

Added from the target size: Your 200 MW project size → requires an indicative size of at least 200 MW (largest contiguous buildable block ÷ 4.25 ac/MW; indicative, basis unconfirmed (DC/AC)). Sites whose buildable block holds less than 200 MW are excluded.

Sources and dates

Each result is a parcel-level site from county parcel data. Texas: the map serves 333,870 sites; 117,681 pass every map exclusion (the map's count with every exclusion on and no other filter). This brief read 117,681 — the same sites. Sites failing an exclusion are not screened here. Record read: 117,681 of 117,681 sites joined to their county record (234 county files). Screened in your geography: 117,681 of 117,681 sites read = 0 meet + 469 need more information + 117,212 excluded.

Preliminary screening only: not an engineering study, interconnection study, permit, or guarantee. Screening only — not a site suitability determination.

Every brief keeps its unknowns visible: what was screened, what was not, and the next check that would settle it.

Screen Texas for your project

Voltane is Texas clean energy screening — solar, storage, wind and hybrid — that ends in a sourced decision record: the land, grid and permitting evidence, and the open questions, behind every site you consider.