Sample Opportunity Brief · Texas
Sample brief: 200 MW solar in Texas
A real Opportunity Brief from Voltane's engine on its Texas data, frozen: the first page as a buyer receives it. The full brief continues with the site comparison, risks, evidence and method.
Objective
A 200 MW solar + storage project in Texas: a site of at least 1,000 acres, a 345 kV line within 2 miles, no more than 500 MW of queued projects within 10 miles, and no federal land. Interconnection capacity at the point of interconnection is also a must-have.
- Region
- Texas
- Project type
- Solar
- Unit
- Parcel sites
- Target size
- 200 MW, indicative
- Screened
- 117,681 sites
Unresolved must-haves
- Unknown Interconnection capacity at the point of interconnection. Not screened for any site. No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.
Outcome
- 0 meet every known requirement
- 469 need more information
- 117,212 excluded: they fail at least one must-have
No site is counted as meeting the requirements while a must-have is unresolved.
Shortlist
Match to default solar + storage profile. Ranked by match within "Needs more information". A match is not a Voltane score, and it never outranks a must-have.
-
148479-00667Webb County, Texas98% match
Grid: ERCOT
5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information
- Pass Site size: 2,110 ac meets the 1,000 ac minimum
- Pass EHV line (345 / 380 kV+): 1.2 mi is within the 2 mi maximum
- Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
- Pass Federal land: no (required: no)
- Pass Indicative size: 419 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
- Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
-
248479-00668Webb County, Texas98% match
Grid: ERCOT
5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information
- Pass Site size: 3,896 ac meets the 1,000 ac minimum
- Pass EHV line (345 / 380 kV+): 0.1 mi is within the 2 mi maximum
- Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
- Pass Federal land: no (required: no)
- Pass Indicative size: 825 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
- Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
-
348479-00706Webb County, Texas98% match
Grid: ERCOT
5 of 6 must-haves pass · 1 unknown · 0 fail Needs more information
- Pass Site size: 2,647 ac meets the 1,000 ac minimum
- Pass EHV line (345 / 380 kV+): 0.5 mi is within the 2 mi maximum
- Pass Queue MW within 10 mi: 0 MW is within the 500 MW maximum
- Pass Federal land: no (required: no)
- Pass Indicative size: 518 MW (indicative, basis unconfirmed (DC/AC)) meets the 200 MW minimum
- Unknown Interconnection capacity at the point of interconnection: not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
Next checks
- Pull the official county record for each shortlisted site (the property ID and record link are in its site panel) and confirm ownership, boundaries and current use.
- Ask the utility or grid operator for a pre-application or feasibility review: distance to a line or substation is not interconnection, and queue figures are a competition proxy only.
- Check county and municipal rules for the technology (local restrictions are listed in each site panel where known).
- Voltane takes no action with outside parties: any contact with landowners, utilities or agencies is yours to make.
Requirements as screened
- Screened Site size (total acres): at least 1,000 ac
- Screened Distance to an extra-high-voltage line (345 kV+): at most 2 mi
- Screened Interconnection-queue MW within 10 mi: at most 500 MW
- Screened Overlaps federal or military land: equal to no
- Screened Indicative project size: at least 200 MW
- Unknown Interconnection capacity at the point of interconnection: must-have, not screened (No public dataset states it; distance to a line is not a connection. An ERCOT interconnection study is needed.)
Added from the target size: Your 200 MW project size → requires an indicative size of at least 200 MW (largest contiguous buildable block ÷ 4.25 ac/MW; indicative, basis unconfirmed (DC/AC)). Sites whose buildable block holds less than 200 MW are excluded.
Sources and dates
- Site size (total acres)TxGIO statewide parcels 2025 (county CAD dates 2025-02 … 2025-07)
- Distance to an extra-high-voltage line (345 kV+)HIFLD transmission (final release 2024-09-30) + OpenStreetMap
- Interconnection-queue MW within 10 miERCOT GIS report, August 2026 (matched to substations)
- Overlaps federal or military landPAD-US 4.1 federal / military manager types
- Indicative project sizeVoltane screening assumption: 4.25 acres per MW (indicative, basis unconfirmed (DC/AC))
- Distance to a high-voltage line (138 kV+)HIFLD transmission (final release 2024-09-30) + OpenStreetMap
- Interconnection-queue MW within 10 mi. Competition proxy only: queued MW located near the site, not a measure of grid headroom; requests that could not be located are not counted, so 0 MW is not "no competition".
- Indicative project size. Indicative, basis unconfirmed (DC/AC): largest contiguous buildable block ÷ 4.25 ac/MW.
Each result is a parcel-level site from county parcel data. Texas: the map serves 333,870 sites; 117,681 pass every map exclusion (the map's count with every exclusion on and no other filter). This brief read 117,681 — the same sites. Sites failing an exclusion are not screened here. Record read: 117,681 of 117,681 sites joined to their county record (234 county files). Screened in your geography: 117,681 of 117,681 sites read = 0 meet + 469 need more information + 117,212 excluded.
Preliminary screening only: not an engineering study, interconnection study, permit, or guarantee. Screening only — not a site suitability determination.
Every brief keeps its unknowns visible: what was screened, what was not, and the next check that would settle it.
Screen Texas for your project
Voltane is Texas clean energy screening — solar, storage, wind and hybrid — that ends in a sourced decision record: the land, grid and permitting evidence, and the open questions, behind every site you consider.