Voltane

Florida · Former coal plant + retiring coal plant + shut-down nuclear site

Crystal River

Crystal River is a former coal plant + retiring coal plant + shut-down nuclear site in Citrus County, Florida. EIA records 2 coal units retired in 2018 (964 MW) and 1,478 MW of coal planned to retire in 2034. 3,449 MW of generation still operates at the site (conventional steam coal, natural gas fired combined cycle): an existing grid connection, shown in the app as a proxy, never as available capacity. 1 reactor unit is permanently shut down (since 2013), per the NRC.

Screening match

Microreactor

66.0 / 100

Data for 92% of the criteria

SMR

79.2 / 100

Data for 92% of the criteria

Large reactor

78.5 / 100

Data for 94% of the criteria

Screening only — not a site suitability determination.

Location

Citrus County, Florida. Approximate location (28.97, -82.70).

Nearby candidate sites

Crystal River ranks 4th of 13 candidate sites in Florida by SMR match.

Get the full screening

Signed-in Voltane Nuclear shows what each match is made of:

Request a demo

All candidate sites in Florida · Every coal plant screened for new nuclear · How Voltane screens sites