Voltane

Glossary

What is site control?

Site control is the legal right to use a piece of land for a project, shown by a deed, a lease or an option.

Common forms of site control

Why grid operators ask for it

Utilities and grid operators do not want to study projects that have no land. Most interconnection processes ask for proof of site control at the start or at a set milestone.

Under the Texas rule adopted under SB 6, a large load customer must show site control before the study with a lease of at least five years, a deed, or a signed option to purchase or lease. Check the PUCT rule for the current text.

Questions people ask

Does a letter of intent count as site control?

Often not. Many processes ask for a signed deed, lease or option. Check the rule that applies to your request.

When should a developer secure site control?

After screening shows the site is worth the cost, and before filing a request that requires it. Options are a common way to hold land while studies run.

Does Voltane tell me who owns a site?

Voltane does not publish landowner names. Its reports give the county property ID and a link to the official county record.

Related

More glossary

Need a site, or have one?

Tell us what you need and Voltane finds, reports on and prices candidate sites in ERCOT. Or bring a site you already have for a path-to-power report (by request for now).

Find me a siteAnalyze my site