Status: Open now, for projects in ERCOT and the rest of Texas.
Who this is for
- Data center developers and site selection teams who need power on a date, not just land
- Energy developers siting solar, storage, gas-to-power or hybrid projects in Texas
- Investors and land teams who want a first list they can check line by line
How it works
- Send a request. Load in MW, target energization year, region, acreage and anything fixed. Plain English is fine. Use the request form.
- We book a call. We pin down the requirements: what is a must, what is a preference and what you already know. You can also book a call directly.
- We run the search. Every Texas parcel in range is checked against your requirements on our engine and marked pass, fail or unknown.
- You get the shortlist. Ranked sites, a report on each one's path to power, a price view for each, and the open questions to settle next.
What you get
- A ranked shortlist with the reason each site is on it
- A report per site: land, the flat buildable block, distance to transmission by voltage, substations, the interconnection queue nearby, flood, wetlands and protected land
- An estimated time to power for each site, labelled as an estimate, with the method published in our research
- A price view for each site, with facts, assumptions and estimates kept apart
- A source and a date on every fact. Where the data is missing the report says unknown, never zero
What it is not
Screening only, not a site suitability determination. Our grid signal is a proxy built from distance to transmission and queue activity. It is not available capacity at a substation, and only a utility or ERCOT study can tell you that. We do not publish landowner names. Each site carries its county record identifier so you can pull the official record yourself.
See the method first
Read a sample brief, the worked examples and how the engine works. The map itself is our internal tool. Clients see it on their own project.
Questions people ask
What do I need to send?
The load in MW, your target energization year, the region you care about and the acreage you need. Add anything that is fixed, such as a utility, a county or a voltage. If you are not sure yet, send what you have and we will sort it out on the call.
Where does Voltane search?
Texas today, with ERCOT as the focus. Sites in the parts of Texas served by other grids are screened too and labelled with their grid.
How much does it cost?
Pricing depends on the scope of the search and is agreed on the call before any work starts. Sending a request costs nothing.
Can I see the map?
The map is Voltane's internal engine. Client teams get access as part of an engagement, on their own project.
Related
Need a site, or have one?
Tell us what you need and Voltane finds, reports on and prices candidate sites in ERCOT. Or bring a site you already have for a path-to-power report (by request for now).