- How to find a data center site in Texas: A step-by-step way to find a data center site in Texas: define the load, pick the grid, screen for power and land, then confirm with the utility.
- The ERCOT large load interconnection process, explained: A plain-English overview of how a large load connects in ERCOT: who is involved, what Texas SB 6 requires before a study, and where to check the rules.
- What makes land "powered land"?: Powered land is land with a credible path to large amounts of electricity. What the term means, what it does not mean, and what to ask a seller.
- Data center site selection checklist: power, land, water, fiber, risk: A data center site selection checklist covering power, land, water, fiber and risk, with notes on what public data can and cannot tell you.
- How to price a powered land site: The factors that drive the price of a powered land site: certainty of power, time to power, scale, upfront costs and site risk. Qualitative guide.
- Time to power: what drives it in ERCOT: What drives time to power in ERCOT: location, voltage, queue crowding, upgrades and readiness. How Voltane estimates it as a range, and its limits.
- Gas-to-power and behind-the-meter generation for data centers: siting basics: Siting basics for gas-to-power and behind-the-meter generation at data centers: fuel, land, air permits, water, grid ties and what maps cannot show.
- Solar and storage site selection in Texas: a first-pass screen: A first-pass screen for solar and battery storage sites in Texas: acreage, flat buildable land, distance to grid, queue context and site hazards.
Also on Voltane: Glossary · Compare · Worked examples · FAQ · Research · Find me a site · Analyze my site
Need a site, or have one?
Tell us what you need and Voltane finds, reports on and prices candidate sites in ERCOT. Or bring a site you already have for a path-to-power report (by request for now).