What makes land "powered land"?

Powered land is a market term, not a legal one. It means land with a credible path to a large power supply. This guide explains what sits behind the label and how to test it.

A working definition

There is no official definition of powered land. In practice, people use it for a site where the power question has been moved forward far enough that a buyer can plan around it. How far is the whole question. One seller may mean "a transmission line crosses the property". Another may mean "a signed agreement with the utility for a stated number of megawatts by a stated date".

What sits behind a real path to power

The further down this list a site is, the stronger the claim.

What "powered" does not mean

Questions to ask about any powered land claim

  1. How many megawatts, and by when? Who said so, in what document?
  2. Has a request been filed? With which utility? What stage is it at?
  3. Have studies been completed? What upgrades and costs did they find?
  4. What security or fees have been paid, and do they transfer with the land?
  5. Is there a signed interconnection agreement?
  6. What form of site control exists, and does it meet the rule that applies?

In Texas, large loads at or above the SB 6 threshold must show site control and post security before the study. See Texas SB 6.

How screening fits in

Screening does not make land powered. It tells you which land is worth the effort of trying. Voltane screens Texas land for distance to transmission and substations, queue competition, planned transmission and site hazards, and shows the source and date of each fact. Its capacity signal is a proxy and never available MW.

If you are looking for candidates, see Find me a site. If you already hold a site and want its path to power reviewed, Analyze my site is available by request.

Questions people ask

Is powered land a legal term?

No. It is a market term. Its meaning depends on who uses it, so ask for the documents behind the claim.

Does land next to a substation count as powered land?

Not by itself. A substation nearby is a place to ask, not available capacity. Only the utility and the grid operator can confirm what a site can get.

Can Voltane certify that land is powered?

No. Voltane screens with public data and labels estimates as estimates. It does not certify capacity or timelines.