Voltane Research · Backtest

How Voltane scores real projects

We took every US nuclear project with an NRC application since 2020 and looked up its site in Voltane: 8 sit on a candidate site, and 3 are not on our list at all.

A screening tool should be tested against what developers actually do. So we wrote down a rule, applied it before looking at a single score, and report every result, good or bad.

The rule

We included every U.S. commercial nuclear power-reactor project, new plants and restarts of permanently shut-down reactors, for which an application filed with the Nuclear Regulatory Commission since January 1, 2020 was pending or approved as of October 16, 2026: a construction permit, combined license, operating license, early site permit (new or renewed), or the exemption and license amendments needed to restart a shut-down reactor. Each site is the one named in the NRC docket or the applicant's filing. We excluded research and test reactors, isotope production, reactors authorized by the Department of Energy rather than licensed by the NRC, license renewals and uprates, and withdrawn or denied applications. Projects in formal pre-application talks with the NRC for a named site are listed separately.

Excluded, and why: Vogtle Units 3 and 4 (licensed long before the cut-off), Oklo's Aurora application at Idaho National Laboratory (denied in 2022; its successor is authorized by DOE), Kairos Hermes and other research or test reactors, isotope-production facilities, reactors in DOE's pilot program, and older licenses with no new filing.

That gives 12 projects, plus 5 in pre-application. A project matches a Voltane candidate when its site is within 3 miles of one (using coordinates from the NRC filing or the applicant's environmental report), or when the docket names an existing plant as the site. We never placed a site by estimate.

Every case, with its Voltane scores
ProjectSiteIn VoltaneMicroSMRLarge
Kemmerer Power Station Unit 1Kemmerer Unit 1 Site, Lincoln County, WyomingNot a candidate; nearest: Kennecott Power Plant, 106 minot scorednot scorednot scored
Long Mott Generating StationLong Mott (Dow Seadrift site), Calhoun County, TexasNot a candidate; nearest: South Texas Project, 47 minot scorednot scorednot scored
Clinch River Nuclear Site, Unit 1Clinch River Nuclear Site, Roane County, TennesseeCandidate: Clinch River Nuclear Site (Early site permit, DOE / federal site)76.669.864.6
Pioneer Units 1 and 2 (Palisades SMR-300)Palisades Energy Center, Covert, MichiganCandidate: Palisades Nuclear Plant (Existing nuclear site)80.782.374.3
Belews Creek Early Site PermitBelews Creek site, Stokes County, North Carolina (next to Belews Creek Steam Station)Not a candidate; nearest: R J Reynolds Tobaccoville Utility Plant, 15 minot scorednot scorednot scored
Project Matador Nuclear Units 1-4Project Matador campus, Carson County, Texas (next to DOE Pantex)Candidate: Pantex Plant (DOE / federal site)72.572.562.9
Blue Energy Center-Port of Victoria Nuclear Unit 1Blue Energy Center, Victoria, TexasLocation not retrieved from a primary sourcenot scorednot scorednot scored
Palisades Nuclear Plant restartPalisades Nuclear Plant, Covert Township, MichiganCandidate: Palisades Nuclear Plant (Existing nuclear site)80.782.374.3
Crane Clean Energy Center restart (Three Mile Island Unit 1)Three Mile Island, Dauphin County, PennsylvaniaCandidate: Three Mile Island / Crane Clean Energy Center (Shut-down nuclear site)65.874.573.3
Duane Arnold Energy Center restartDuane Arnold Energy Center, Linn County, IowaCandidate: Duane Arnold Energy Center (Shut-down nuclear site)87.584.472.4
Grand Gulf ESP Site (renewal)Grand Gulf ESP Site, next to Grand Gulf Nuclear StationCandidate: Grand Gulf Nuclear Station (Existing nuclear site, Early site permit)81.093.391.4
North Anna ESP Site (renewal)North Anna ESP Site, Louisa County, VirginiaCandidate: North Anna Power Station (Existing nuclear site, Early site permit)80.785.181.2
Cascade Advanced Energy FacilityNext to Columbia Generating Station, Hanford, WashingtonCandidate: Columbia Generating Station (Existing nuclear site)79.985.375.8
Joshua Falls Early Site PermitJoshua Falls property, Campbell County, VirginiaLocation not retrieved from a primary sourcenot scorednot scorednot scored
Last Energy Haskell siteHaskell, TexasLocation not retrieved from a primary sourcenot scorednot scorednot scored
RELLIS Campus ESPTexas A&M RELLIS Campus, Bryan, TexasLocation not retrieved from a primary sourcenot scorednot scorednot scored
Kewaunee New Nuclear InitiativeKewaunee Power Station site, Kewaunee County, WisconsinCandidate: Kewaunee Power Station (Shut-down nuclear site)74.584.278.4

Scores out of 100 at each class's default weights; "not scored" means the site is not a Voltane candidate. Ranks and sources are in the data file. Data (JSON)

Screening only — not a site suitability determination.

The hits

Of the 12 projects, 8 sit on a Voltane candidate site, and 5 of those score in the top quarter of all 504 candidates for SMRs.

The middle

The misses

3 projects are not on Voltane's candidate list at all, and one we could not place:

What the misses teach

In pre-application, 2 of the 5 named sites are Voltane candidates; the others, greenfield or campus sites, have no primary-source coordinates we could retrieve yet.

Screening only — not a site suitability determination.