The data behind a data center site report

Buyers of site data ask for the same dozen things. This page lists each one, what Voltane uses for it, and where the public data stops. Every source is free and public, and every figure in a report carries its source and date.

The list, item by item

What buyers ask forWhat Voltane usesWhere it stops
Operating and planned data centersMapped data centers within 25 miles of the site, from OpenStreetMap and Epoch AICommunity-mapped and not exhaustive. For Texas, reports also list the tracked projects within 50 miles with the stage the public record shows
FiberFor Texas site searches, the fiber service that providers report to the FCC near a siteA proxy. It is not a map of fiber routes, dark fiber or capacity
Baseline water stressThe water stress category of the site's river sub-basin, from the World Resources Institute's Aqueduct 4.0A basin-scale indicator. It says nothing about water rights or what a utility can serve
Gas pipelinesThe nearest mapped pipeline, whether it is interstate or intrastate, and its operator, from the U.S. Energy Information AdministrationMajor pipelines only, mapped in 2020. A pipeline nearby is not a tap or firm supply
Compressor stationsThe nearest gas compressor station and the gas plants within 25 miles that report to the U.S. EPA's greenhouse gas programReporting facilities only. Smaller stations are missing
Gas receipt and delivery pointsThe points that Transwestern, Trunkline and Florida Gas Transmission post in the site's county, with flow direction and the connected partyThree pipelines only, and placed by county: the postings carry no coordinates. A posted point is not a tap for a new customer
Gas contractsFor the same three pipelines, the quarterly index of customers: who holds capacity, how much, and when each contract's term endsIt shows when contracts end, never what is available: holders usually have renewal rights. The other interstate pipelines post through forms a script cannot read
Open seasons and pipeline expansionsThe pipeline projects in the site's state that are announced, in permitting or under construction, from the Energy Information Administration's project tableA state-level list. A project in the state may be far from the site
Land parcelsTexas county appraisal parcels for site searches. For a report, you bring the boundaryNo landowner names are published. Each site links to the official county record
Floodplains, wetlands and slopeFEMA flood hazard zones, the National Wetlands Inventory and USGS elevationWhere FEMA has no digital map the answer is unknown, not zero. Wetland maps are not a delineation
Buildable areaThe shares of the site in flood zones, wetlands and protected land, the share steeper than 5 percent, and the largest flat block outside all of them, as an estimateA screen from mapped data. A survey and a site walk decide the layout
Chance of successFor a Texas site, an estimated chance that a grid request filed now is energized by a given year, from how long past ERCOT generation projects took. For tracked Texas projects, the furthest milestone on recordThe estimate rests on power plant history, not data center history, and says so. No chance of success is given for a named project

What sits on top of the list

The list above is inputs. A site decision turns on what they add up to, so a report also gives:

See the sample report for how it reads.

What no public dataset gives you

Voltane says so in each report instead of filling the gap with a score.

Questions people ask

Does Voltane use paid data?

No. Every source behind a report is free and public, and each figure names its source and date.

Does Voltane show available capacity at a substation?

No. Distance to lines and substations is a proxy for access. Available capacity comes from utility and grid operator studies.

Does a low water stress category mean a site has water?

No. Water stress is measured for a whole river sub-basin. Supply for a site depends on the local provider and on water rights.

Does Voltane give a chance of success?

For a Texas site, Voltane estimates the chance of power by each year from how long past ERCOT generation projects took to connect. That is power plant history, not data center history, and it is labelled as an estimate. For a named project Voltane gives the stage on record, not a probability.